Bronwydd Arms Level Crossing – Part 6

After a few weeks of aligning, drilling and fitting the hinges to the second gate, this one has now also been installed at Bronwydd Arms. We were blessed with good weather compared to when we put up the first gate. Once again members of staff from all departments dropped what they were doing to help, at one point we had… (more…)

Bronwydd Arms Level Crossing – Part 5

To align both gates in the correct positions, locating the south side gate post was going to be the next challenge. The original concrete base needed enlarging and was then drilled to take the post locating studs.These were fixed in the concrete with a special waterproof resin. A few days later the base plate and post were attached. The gap… (more…)