CNP NEWS 6th December 2010 Returning to the northern side of the crossing, the first of the two new wooden gates has been installed. The gates had already been drilled and fitted with the hinges.Conditions far from ideal but as the team were working to a deadline work continued. With the gate fixed to the hinge pin,two long metal bars… (more…)