Monthly Archives: September 2010

The S&T Signal Changes

The S+T Department press on with carrying out work associated with the extension. The bracket signal which controlled the access to Main/Loop at Bronwydd Arms was decomissioned and replaced by a double dummy. With the resignalling of the Carmarthen end of the station this signal needed to be repositioned on the Carmarthen side of the level crossing.Rather than just replant… (more…)